PT MINEMEX INDONESIA PROJECT OVERVIEW

PT MINEMEX INDONESIA PROJECT OVERVIEW

Mine Owner

PT Minemex (Subsidiary of PT Thriveni)

Area

3,700 Hactares

Reserve

111 Million Ton (JORC)

EC Capacity

3 MTPA

Coal Production As on Date

11.5 Mn Ton

Location

Mandiangin Village, Jambi Province

icon
PT Thriveni Indo Mining

PT Thriveni Indo Mining (formerly known as PT.MBB) is presently engaged in operations in South Kalimantan at the Satui Coal Project, which falls under the purview of CLS (Arutmin). The project entails a capacity of approximately 45 million cubic meters of overburden (OB) and around 3 million metric tons of coal. Additionally, TIM (Thriveni Indo Mining) is actively involved in an equipment refurbishment project in collaboration with CLS, which encompasses around 51 units of various equipment such as Diggers (EX 3600, EX 2500, and R 984), Dumpers (CAT 785 C and 777 D), Track Dozers (D10 T/R and D8R), and Graders (16 H and 14 M). The objective of this project is to restore and improve the condition of the aforementioned equipment to operational standards.

icon
PT IBAI

PT IBAI intermediate port is located at Jebak Village having 100K Ton storage capacity in 9 Ha area. The jetty is located 40Km away from the mine area along the bay of Tembesi River. There are 2 types of loading facility infrastructures catering to load barges upto 2500 MT. One loading facility is equipped with conveyor mechanism and the another one is by manual loading arrangement.

One loading facility is equipped with conveyor mechanism and the another one is by manual loading arrangement.

icon
PT KBP

PT Karya Bhakti Projects (KBP) port is located 165 Km away from the mine area along the bay of Batanghari river at Talang Duku in Jambi province with 22 Ha land area and 500K Ton storage capacity. The Port facility is having infrastructure to load upto 8000 Ton barges with 3 loading arrangement.

The MV loading anchorage point is situated 100 Nautical mile from the KBP Port facility. The Barge Voyage time is around 30Hrs from KBP Port to MV Loading point

icon

COAL BRIQUETTE PLANT

Briquette is a product made through a process of converting Low GAR and High Moisture Coal to High GAR and Low Moisture Coal.

COAL BRIQUETTE PLANT

Briquette is a product made through a process of converting Low GAR and High Moisture Coal to High GAR and Low Moisture Coal.

  • High Moisture content 50-60%
  • Low CV (2,600–2,800 GAR)
  • High logistics cost (carry water)

Efficient Low Cost Process

  • Low Moisture 10-15%
  • High CV (>5,200 GAR)
  • Saving on logistics cost